TASMANIAN PROJECTS

2006

v                25 Wind Towers for Woolnorth Stage 3.

v                Batman Bridge Structural Painting

v                22 Bridge Girders ( Export to Vic)

v                50m Diameter Tank (Export to QLD)

2005

v                Batman Bridge Structural Painting

v                Poatina Pondage – Weir Gates

v                Caltex Tank Farm

v                3 Bridges for Dept of Infrastructure, Energy & Resources (Lead Removal)

2004

v                Batman Bridge Structural Painting

v                Trevallyn Power Station Spiral Casings

v                Bell Bay Power Station Cooling Water Pump

v                Mackinnons Hill Reservoir

v                25 Wind Towers (Export to South Aust)

2003

v                13 Bridges for Dept of Infrastructure, Energy & Resources

v                Trevallyn Power Station Penstock

v                2 Wind Towers for King Island

v                31 Wind Towers for Woolnorth Stage 2

v                Re-Lining Liaweinee Canal

2002

v                 Woolnorth wind turbines

v                 1 km rising main penstock at Arthurs Lake

v                 Tasmanian Natural Gas Project

v                 Otway Ranges Airwalk

v                 Avoca Reservoir Internal

v                 6 Wind Towers for Woolnorth Stage 1

2001

v                 Southern Stand at the Bellerive Oval

v                 Tahune AirWalk in the Huon Valley

2000

v                 Abt Wilderness Railway.

v                 Re-painting more than 30 historic bridges along the track

1999

v                 Department of Infrastructure, Energy and Resources.

v                 Victoria Bridge at Devonport

v                 Hellyer River Bridge, on the West Coast of Tasmania

1998

v                 Batman Bridge A-frame,

v                 With towers more than 90m above the Tamar River, Northern Tasmania.

1997-1998

v                 The Emu Bay Railway bridge over the Bastyan Dam. Metal Protection Service grit-blasted and re-painted the entire structure - replacing 7000 bolts.

 














This site is © Copyright Metal Protection Service Pty Ltd 2006, All Rights Reserved